Paving stone material estimator

Paver Patio Calculator

Estimate individual pavers, pallets, compacted aggregate base, bedding sand, edge restraint, excavation and material cost for patios, walkways and other rectangular paved areas.

Layer assumptions referenced to CMHA guidanceUpdated

Project inputs

Measure the paved area

Paved sectionsAdd rectangles for steps, landings or connected patio areas.
Surface

Paver size and pattern

Foundation

Base and bedding layers

Perimeter

Edge restraint

Optional material prices

Pavers to order1,469 pavers

For 300 sq ft in running bond, including 7% paver allowance.

Project area300 sq ft
Full pallets4 pallets
Aggregate base11.47 US tons
Base volume6.11 yd³
Bedding sand1.38 US tons
50 lb sand bags55 bags
Edge restraint9 pieces
Restrained perimeter70 ft
Excavation volume8.68 yd³
Material costUSD 2,434
2.38 in pavers
1 in bedding sand
6 in compacted base
Prepared subgrade

Purchase checklist

Paver patio material breakdown

MaterialQuantityUnit priceSubtotal
Estimated material totalUSD 2,434

Joint sand, geotextile, delivery, equipment, drainage, labor, taxes and site-specific excavation are not included.

Transparent math

How the paver estimate is calculated

  1. 1
    Add rectangular project areas

    20 ft x 15 ft = 300 sq ft

  2. 2
    Divide by the paver module and add pattern allowance

    ceil(43,200 in² / 31.5 in²) x 1.07 = 1,469 pavers

  3. 3
    Calculate compacted aggregate base

    300 sq ft x 0.5 ft x 1.10 x 139 lb/ft³ / 2,000 = 11.47 US tons

  4. 4
    Calculate bedding sand

    300 sq ft x 0.0833 ft x 1.10 = 27.5 ft³ = 55 bags

  5. 5
    Total exposed perimeter for edge restraint

    70 ft - 0 ft deduction = 70 ft / 8 ft = 9 pieces

Installation assumptions

What to confirm before ordering

Bedding course

CMHA guidance uses a nominal 1 in (25 mm) bedding sand layer for interlocking concrete pavers. Bedding material should not be used to correct an uneven base.

Base depth

The default 6 in base is a planning example for a residential patio. Soil, drainage, frost, climate and vehicle loading can require a different design.

Paver dimensions

Use actual face dimensions and the intended joint width. Mixed-size patterns should be estimated from the manufacturer's stated coverage per layer or pallet.

Compacted dimensions matter

Enter finished compacted layer depths. Loose delivered aggregate may occupy more volume before placement and compaction; confirm bulk density and delivery quantity with the supplier.

Common planning questions

Paver calculator FAQ

How many extra pavers should I order?

The preset allowances are 5% for straight lay, 7% for running bond and 10% for herringbone. Complex borders, curves, color blending and mixed-size patterns may need more.

Does joint width affect the paver count?

Yes. The calculator treats paver length plus joint width and paver width plus joint width as one repeating module.

Does the sand result include polymeric joint sand?

No. It estimates the bedding course only. Joint sand coverage depends heavily on paver thickness, joint width and product specifications.

Why can multiple rectangles overstate edge restraint?

Each rectangle contributes its full perimeter. Enter shared boundaries or wall edges in the deduction field so they are not counted twice.

Can I use this for a driveway?

The arithmetic works, but vehicular pavement requires a project-specific base, compaction and drainage design. Verify it with the paver manufacturer or a qualified local installer.